Projects of JSC "MAGNITOGORSK GIPROMEZ" are realized in industrial enterprises units in many regions of Russia:

REPUBLIC OF BASHKORTOSTAN

  • grounding of investments for construction of the metallurgical plant on section rolled steel production (town Yanaul);

Transural TPS (Thermal Power Station) of OJSC "Bashkirenergo"

  • installation of gas piston-like units (equipment of the firm "Jenbacher", Austria) to provide with own electric energy and to improve heat supply for the population of town Sibai. The architectural project of the Transural TPS was rewarded with an honorary diploma in the International festival "Architecture-2003";

BRYANSK REGION

LLC "PK" BEZHITSKY STEEL WORKS"

  • substation 110/6 kV. Project and working documentation.

VOLOGDA REGION

OJSC "SEVERSTAL"

  • reconstruction of the converter production with installation of "furnace-ladle" unit (equipment of the firm "VIA-FUCHS", Austria);

IRKUTSK REGION

LLC "BRATSK FERROALLOY PLANT"

  • re-equipping of the existing ore heat-treating furnaces with capacity gain from 25 MBА to 33 MBА for an increase of production of ferrosilicium;

KRASNODAR REGION

LLC “Armavir electrometallurgical plant”

  • Complex for production of billets and long products. Melt shop

KRASNOYARSK TERRITORY

LLC “Sibmag”

  • Magnesite treatment complex. Magnesite decarbonization in multiple-bedded furnaces 200th. t/y capacity.

MOSCOW REGION

OJSC "SHCHELKOVO PLANT "SPETCMONTAZHIZDELIE"

  • modern service metal centre for reprocessing of zinc-plated rolled steel and polymer-coated rolled steel at existing areas (equipment of Finland firms “ROLLSET MACHINE OY” and “SAMESOR”, the Italian firm “CAMU” and the Australian firm “HILLENG”);

NIZHNY NOVGOROD REGION

OJSC “VYKSA STEEL PLANT”

  • wheel rolling mill. Technical re-equipping. Area for production of rail way wheels.
  • ТЭСЦ-2 reconstruction. Installation of small diameter tube mills.

 

ORENBURG REGION

OJSC "URAL STEEL"

  • reconstruction of the electric steel-smelting shop with installation of equipment of the electrical furnace and CCM for the purpose of increasing capacity up to 2 mln.t steel per year (equipment of the firm "SMS DEMAG", Germany);
  • reconstruction of the sheet rolling shop for the purpose of changing the obsolete equipment in the main line of the hot rolling mill 2800, and reconstruction of holding furnaces (equipment of the firm "SMS DEMAG", Germany and the firm "CMI", Belgium);

LLC "PROMINNTEKH"

  • installation of equipment for production of thermo-diffusion zinc plating (with increased corrosive and abrasive resistance) of pipes for oil and gas industry;

PERM TERRITORY

OJSC "SOLICAMSKBUMPROM"

  • steam boiler room complex of 150 t/hour capacity (supply of equipment by OJSC “SKBK”, Russia);

SAMARA REGION

Investment grounding for construction of the metallurgical plant on section rolled steel production

SVERDLOVSK REGION

OJSC "NIZHNI TAGIL STEEL WORKS"

  • blast furnace # 5 and objects of the complex reconstruction, furnace capacity increasing (batch routing equipment by OJSC “Uralmash” Russia, aspiration system by “Fingo” Russia);
  • blast furnace # 6 dedusting system (equipment by "PAUL WURTH");
  • reconstruction of wheel rolling shop, revamping of bandage control line (equipment by “LOI”, Germany), wheels thermal treatment area reconstruction (equipment by "ANDRITZ MAERZ", Germany).

OJSC "PERVOURALSK NEW PIPE PLANT"

  • grounding of investments for construction of the complex of the electric steel-smelting shop;

OJSC “KUMZ”

  • rolling mill complex inside the cold rolling shop to produce aluminium sheet and coils, hot rolling shops and thermomechanical treatment of plates and sheets.

TYUMEN REGION

LLC "UGMK-Steel"

  • grounding of investments and the project of the mini-plant on section rolled steel production for the purpose of providing the Siberian region with construction profiles and reinforcement (equipment of the firm "DANIELI", Italy);

 

CHELYABINSK REGION

LLC "Satka iron melting plant"

  • reconstruction of the Blast Furnace № 3 complex for the purpose of organizing ferromanganese production in amounts of up to 190 tons per day including process optimization and effectiveness increasing of environment protection measures.

CJSC "Aleksandrinsk ore mining company"

  • the preparation plant complex for cooper-zink ores and others.

 

OJSC “MAGNESITE”

  • Construction of multiple-bedded furnace 100 th. t/y. Project and working documentation.

 

OJSC “URALAZENERGO”

  • TPP. Turbogenerator installation.