JSC "MAGNITOGORSK GIPROMEZ" is the general designer of the giant plant of home industry - OJSC "Magnitogorsk iron and steel works" (OJSC "MMK"). Problems in continious development, reconstruction, modernization of OJSC "MMK" are primary tasks for the institute and its orders are priority. New shops were constructed according to projects of JSC "MAGNITOGORSK GIPROMEZ", all production units of OJSC "MMK" were modernized and re-equipped technically.
Mining and beneficiation plant |
|
|
|
BLAST FURNACE PRODUCTION |
|
|
|
EAF production |
|
|
|
OXYGEN-CONVERTER PRODUCTION |
|
|
|
ROLLING PRODUCTION |
|
Revamping of long products mills
|
|
Reconstruction of hot rolling mill 2500
|
|
Rolling shop №5
|
|
Rolling shop №10
|
|
The complex of hot rolling mill 5000
|
|
Hot dip galvanizing line (HDGL) № 1 and № 2
|
|
Construction of new rolling shop – RS № 11
|
|
POWER ENGINEERING FACILITIES |
|
In boiler department of the Steam Airblast Power Plant -2 a steam boiler № 7 has been mounted. For complex steel degassing plant in the oxygen-converter shop a steam overheating plant has been projected and put in operation. In steam-power shop two turbo-generators STR has been mounted. In blast furnace shop nitrogen compressor has been mounted for furnaces №№ 1-10. For the electric steel-smelting shop complex the following has been projected and put in operation:
To supply electric power to consumers of OJSC "MMK" and the Magnitogorsk city with voltage 110 kv, 35 kv, and 10 kv the reconstruction of open switchboard 110 kv for thermal and central power stations and substation № 60 has been carried out. For technical re-equipping of the oxygen-converter shop at oxygen station № 4 an oxygen unit complex АКАr-40/35-2 has been put in operation. For plate mill complex 5000 at rolling shop № 9 the following has been projected and put in operation:
For cold rolling complex at rolling shop № 11 the following has been projected:
|
|
CITY ENTERPRISES |
|
LLC "Magnitogorsk energy company"Gas piston power station with four gas piston-like units devices has been projected and put in operation. OJSC "Magnitogorsk cement refractory plant"Gas exhaust ducts of furnaces № № 1, 2 at gas-cleaning plants behind rotary furnaces № № 1,2,3 have been reconstructed. The rotary furnace № 4 at the clinker production processing line has been projected and put in operation. The 5-th clinker production processing line has been projected and is being constructed now. LLC "Refractory"To increase production capacity of the magnesian dolomitic refractory shop expansion of production has been carried out. |